Utility works · Gildersome, Leeds
Utility access across sloping farmland
A connected route from the site entrance down to the working area, using 237 TM120 heavy-duty composite mats.
The job
From the entrance down to the working area.
The team carrying out utility works near Gildersome in Leeds needed an access route from the site entrance down to their working area, across sloping, grassed farmland and with winter on the way. TrackMatz supplied 237 TM120 heavy-duty composite mats to do the job.

The challenge
A narrow corridor down the hill.
The route had to follow the hill and fit a narrow corridor between fields, hedgerows and temporary fencing. A stone road was considered, but reusable ground protection matting provided a connected route without an aggregate road across the land.

The solution
One continuous track.
We supplied 237 mats and connectors for a planned single-lane route with passing places. The site photographs show connected mats following the slope through the grassed corridor, alongside the TrackMatz delivery vehicle on site.
On site
The route, from delivery to the working area.
The product
TM120 heavy-duty composite mats.
The Gildersome route was built with 237 TM120 mats and connectors — a heavy-duty system used for utility access across sloping, grassed ground.
View TM120
Useful guides
Plan the next route with the right information.
Product & access
Technical guides
Plan a project
Next step
Planning a similar route? Let’s review the route.
Send the site location, ground photographs, proposed route, vehicles and dates. We’ll review the matting and delivery requirements with you.
Indicative only. TrackMatz confirms suitability before any proposal.