TECHNICAL GUIDE

Ground protection.
Technical guide.

For event access, contractor routes and temporary works, supplier figures describe product capability. This guide shows how ground strength, load footprint, traffic and layout qualify the right starting class for the project.

START HERE

Eight practical guides.

Start with one clear question, from ground strength and quantity to product choice, hire or purchase, delivery and installation.

Deeply rutted saturated ground illustrating why CBR matters01 · CORE GUIDEGround strength

CBR explained

Understand how ground strength affects temporary access design, why supplier guidance is not site permission and which project details are needed before a product class can be confirmed.

Read the CBR guide →
Composite ground protection route illustrating matting coverage and layout02Quantity and layout

How much matting do I need?

Estimate coverage, route width and quantity, then account for layout and site decisions that can change the count.

Read the guide →
Timber bog mats and composite ground protection panels shown side by side03Material choice

Bog mats vs ground protection mats

An honest timber and composite comparison, including where each approach can make practical sense.

Compare the options →
TM120 heavy duty panels illustrating product load guidance04Product data

Supplier guidance and site limits

Review published product guidance, then the ground, footprint, traffic, turning, duration and layout checks that qualify it.

Compare the guidance →
Ground protection installation illustrating delivery and installation planning05Project delivery

Delivery and installation methods

How mats arrive, how they are installed or supplied for dry hire, and the information needed for a considered proposal.

Read the method →
TM50 panels being handled during a TrackMatz installation06TrackMatz approach

Our method

How manufacturer data, available ground information, seasonal conditions and project details are used to reach an indicative class and final review.

See how we work →
MegaDeck HD+ panels being installed, illustrating handling costs when hiring or buying mats07Hire or purchase

Hire or buy ground protection mats?

Compare the complete cost, repeat use, storage, transport and handling before choosing hire or ownership.

Read the hire-or-buy guide →
MegaDeck HD+ composite trackway forming a connected site access route08System comparison

Composite mats vs aluminium trackway

Compare composite mats and aluminium trackway: pros, cons, handling, ground conditions and complete project cost.

Compare trackway systems →
TM10 rubber matting laid as a pedestrian walkway across grass09Access planning

Accessible temporary walkways

Width, gradient, joints and edges for wheelchair and mobility scooter routes over grass, with UK benchmarks and sources.

Plan an accessible route →
Temporary access panels on wet winter ground10Ground and weather

Clay ground in winter

Why clay loses strength through autumn and winter, what UK guidance says, and seven checks for a route that has to last.

Plan a winter route →
MegaDeck HD+ access route across wet grassland beneath an overhead power line11Environment and land

Temporary access on sensitive ground

Soils, tree roots, watercourses, SSSIs and buried services: what UK guidance says and seven checks before mobilising.

Plan a sensitive ground route →
THE SHORTCUT

Not sure which guide or product class to start with? Use TrackSpec™ for an indicative product class and mat count, followed by TrackMatz review.

Try TrackSpec™Six quick fields · indicative class and mat countSTART →
PRODUCT RANGE AND CURRENT DOCUMENTS

Compare the four duty classes.

Use the product page for audited commercial context, then open the current technical PDF for dimensions, weight, materials, connectors and supplier guidance.

TM10 light duty ground protection mats forming a pedestrian routeLight duty class

TM10

Pedestrian-first access

Recycled rubber panels, hand-installed by two. Pedestrian routes and step-free access. Occasional cars require ground and traffic assessment; vans, trucks and plant normally require a higher class.

  • Panel1.2 × 0.8 m × 22 mm
  • Weight20 kg
  • SupplierUp to 10t suggested · tested to 20t
  • InstallHand, no plant
TM50 medium duty composite matting forming a temporary routeMedium duty class

TM50

Assessed vehicle routes

Isokon ISOtrack L recycled HDPE for assessed vehicle routes, compounds, events and temporary car parks. Connector provision matched to layout.

  • Panel2.41 × 1.2 m × 20 mm overall
  • Weight36 kg
  • SupplierUp to 20t softer · 50t+ firm ground
  • Install2-person or forklift
TM120 heavy duty composite access mats supporting tracked plantHeavy duty class

TM120

Plant routes and compounds

Recycled HDPE roadway panels for assessed heavy vehicles, compounds and year-round civils. Steel strap and M16 bolt connectors.

  • Panel3 × 2.5 m × 40 mm
  • Weight295 kg
  • SupplierLoads up to 60t · vehicles up to 100t
  • InstallPlant required
MegaDeck HD+ orange composite mat with MDX connection openingsFlagship access system

TM200

Heavy access and working areas

MegaDeck HD+ composite matting with MDX connections for assessed heavy plant routes, working areas and infrastructure projects.

  • PanelApprox. 4.3 × 2.3 m × 101.6 mm
  • Weight465 kg
  • Load guidanceProject-assessed loading
  • InstallPlant · MDX connections
See how the MDX connection works

Supplier figures are useful product context. They are not automatic permission for a particular vehicle, route, duration or site. TM200 suitability for concentrated loads and crane access remains subject to competent engineering and project review.

RESPONSIBLE SPECIFICATION

Product guidance, qualified for the project.

Responsible specification considers the product data, the actual operating conditions and the practical environmental impact of the route and installation plan.

TM50 composite matting illustrating product specification data
Check 01 · Product guidance

Start with current supplier data.

Use the stated dimensions, materials, connector system and load guidance, including the conditions attached to those figures.

  • Dimensions
  • Materials
  • Connections
  • Load guidance
Soft saturated ground illustrating the need for project qualification
Check 02 · Site qualification

Test the class against the project.

Review available ground information, load footprint, movements, turning, duration, route preparation and panel layout before suitability is confirmed.

  • Ground and CBR
  • Load footprint
  • Traffic frequency
  • Route and layout
Temporary civils access illustrating route and installation planning
Check 03 · Environmental impact

Use a proportionate access plan.

Consider ground disturbance, route length, handling and vehicle movements, material reuse, installation and removal. The highest class is not automatically the most responsible choice.

  • Ground disturbance
  • Route efficiency
  • Handling plan
  • Material reuse

TrackSpec™ provides an indicative product class and mat count. TrackMatz review is required before a proposal is issued or a product is used. Where the available information is not enough, further project detail or a site survey may be needed.

See how CBR changes the decision →