TM120. Heavy vehicle access, trackway and civils compounds.
Heavy duty track mats for hire and temporary roadway hire for assessed heavy vehicle access, short-duration plant routes, compounds and programme work. We check the ground, load footprint, turning, traffic and duration, then propose, deliver and install the right system.
The right kit. The right team.
Heavy Duty Footprint
Each 3m by 2.5m panel covers 7.5m². Transport and layout are planned to the project quantity and route.
Machine-Placed Panels
Panel weight. A HIAB or heavy-duty forklift is required, with trained personnel guiding the installation.
Published supplier guidance.
Loads up to 60 tonnes and vehicles up to 100 tonnes, subject to panel configuration and ground conditions.
Pro crew on the truck.
The team that loads the kit lays the trackway. Or self-collect with a full layout brief.
UK Mainland Mobilisation
24-hour mobilisation is available on many projects, subject to stock, route, quantity and installation requirements.
What the TM120 is built for. And what needs another answer.
TM120 is TrackMatz's heavy-duty roadway panel. Supplier guidance references loads up to 60 tonnes and vehicles up to 100 tonnes, but the ground, vehicle or track footprint, turning, traffic frequency, duration and route preparation decide whether it is the right system.
Strong heavy-duty applications.
- Assessed heavy wheeled vehicle access and HGV routes.
- Short-duration rubber-tracked plant movements on prepared ground.
- Civils compounds, laydown areas and controlled plant yards.
- Utilities, rail and solar access where the route and traffic are reviewed.
- Heavy event back-of-house routes and delivery areas.
- Longer programmes with a planned base, geotextile and inspection regime.
Conditions that require a project review.
- Steel-tracked plant without prior written approval.
- Crane access, lifting operations or outrigger support without an engineered review.
- Raw saturated ground, standing water or a route with no practical preparation.
- Deep ruts, voids or any requirement to bridge unsupported ground.
- Long-duration heavy traffic without base preparation and maintenance.
- Any selection based only on a headline tonne figure.
Supplier figures are product guidance, not universal site working limits. Low CBR can make a much lighter vehicle unsuitable. TrackSpec and the project review qualify the complete route.
Published panel data. Project-specific approval.
Current supplier data for the TrackMatz fleet, followed by the checks that determine whether TM120 suits the route.
| Dimensions | 3,000 mm × 2,500 mm × 40 mm |
|---|---|
| Usable surface | 7.5 m² per panel |
| Weight | 295 kg per panel |
| Material | Compression moulded 100% recycled HDPE 100% recyclable. |
| Surface | High-profile vehicle side and low-profile underside |
| Connections | Metal straps and M16 bolts |
| Supplier guidance | Loads to 60 tonnes; vehicles to 100 tonnes Subject to panel configuration and ground conditions. |
| Site approval | CBR, footprint, traffic, turning, duration and preparation assessed |
Source: current supplier panel and product guidance, checked July 2026.
Mechanically connected for the agreed layout.
Metal straps and M16 bolts connect adjacent panels. The layout, connector quantity and installation method are planned around the route and expected movement.

The strap bridges adjacent connection points and helps control relative movement across the planned layout.

M16 bolts secure the connector straps. The installation team tightens and checks the fixings as part of the agreed method.
The connector mix follows the design.
The proposal identifies the agreed mat and connector layout. Lost or damaged items are handled under the quoted hire terms.
Machine placement is required. TrackMatz can plan delivery, installation, inspection and uplift as one service.
Machine-placed by trained personnel. At 295 kg per panel, TM120 requires a HIAB or heavy-duty forklift. The route is graded and levelled as required, with geotextile ideally used beneath the panels.
What 60 tonnes and 100 tonnes mean on real ground.
Current supplier guidance references loads up to 60 tonnes and vehicles up to 100 tonnes, subject to panel configuration and ground conditions.
Those are product ratings, not automatic permission to run that weight on site. Low CBR can make a much lighter vehicle unsuitable, so TrackSpec and the project review qualify the complete route.
60t loads. Vehicles to 100t.
- Product guidance, not a universal working limit
- Subject to panel configuration
- Subject to ground conditions
- Site-specific checks still required
The whole project.
- CBR and route preparation
- Wheel or track contact area
- Turning, braking and traffic frequency
- Duration, layout and inspection plan
The supplier rating is the product ceiling. The ground and operating conditions determine whether the site can use it.
Owned fleet. Pro install. Same team end to end.
From your first call through to off-hire collection, the same team handles every step. No middleman. No sub-contracted install. Owned trucks, dedicated logistics, professional install crew. Heavy duty surface connected, secured and inspected.
Tell us area, ground, plant, duration. We spec the right class on the call. TM120 or a different mix.
Mat class, quantity, route preparation, delivery, installation, connector kit and collection are itemised in the proposal.
Delivery and machine placement are planned around stock, route, quantity, site access, ground preparation and the agreed connector layout.
One pickup. Connectors counted. Fleet washed, returned to stock. Transparent terms, minimal hassle.
Heavy-duty access with clear project checks.
These are strong TM120 applications. If the ground, traffic or duration sits outside them, TrackSpec or our team will move the project to the right class.
Assessed access routes
Heavy wheeled vehicle routes planned around the ground, footprint and movement.
ROADWAYTemporary haul routes
Heavy-duty connected roadway panels for assessed plant and delivery traffic.
CIVILSCompounds and laydowns
Controlled routes, welfare bases and laydown areas with route preparation agreed.
UTILITIESUtilities access
Pipeline, cable, substation and overhead-line access assessed project by project.
EVENTSHeavy back-of-house traffic
Delivery, generator and structural-build routes where conditions suit TM120.
SOLARSolar construction routes
Compounds and installation routes with preparation and programme duration reviewed.
PROGRAMMELonger hire planning
Base, geotextile, inspection and maintenance planned for longer-duration work.
EVIDENCEProject examples
See how TrackMatz plans, installs and supports temporary access projects.
Take the data away. Then check the application.
Download the current TM120 specification sheet or send the project conditions for a product-class review.
TM120 technical sheet
A two-page reference for project files, tender responses and internal review.
- Current dimensions, weight and material
- Supplier ratings and CBR qualification
- Suitable and unsuitable applications
- Connection and installation system
- TrackMatz contact and review route

Check whether TM120 fits
Send the ground, traffic, area, dates and postcode. We will confirm TM120 or recommend the correct class.
- Ground and route review
- Traffic and load-footprint check
- Indicative mat class and quantity
- Delivery and installation considerations
- Clear next step from our team




