Trackway Selector

TrackSpec™
Ground protection mat calculator.

Indicative ground protection and trackway recommendation in under 60 seconds. Uses published product guidance and your project inputs. Site suitability and the final layout are confirmed by our team.

PostcodeContext
Broad regional ground indicators. A postcode does not measure site CBR.
SpecDriven
Published product facts support an indicative class and quantity estimate.
ProjectReview
Ground, loading and layout checked before commitment.
SeasonalProjection
Conservative seasonal assumptions across the selected hire window.
SuitableNext Step
Indicative options where supported, or a project assessment where needed.
TrackMatzConfirms
TrackSpec™ opens the conversation. We confirm spec before commitment.

Indicative only. We'll confirm with you by phone or email before any commitment.

A QUICK WALKTHROUGH WITH MARK

See how TrackSpec works.

Follow the project, ground and layout steps. The current tool also asks about slope, rutting and the width of a route.

Start using TrackSpec
Step1

The Project

Step2

The Site

CBR in 10 seconds. CBR is the standard measure of ground bearing. Higher CBR = firmer ground = mats can carry more weight. The softer your ground, the heavier the mat you need.
Read the CBR guide →
Source data: British Geological Survey Soil Parent Material Model (Open Government Licence v3.0) · DMRB CD 225 (National Highways) · BS 1377-9.

We'll pull the typical ground for your postcode area to help you pick the right tile below. Optional but recommended.

Postcodes are checked using postcodes.io. See our privacy notice.

Ground type

Talk to us Not sure? We'll work it out on the call.📞 01785 290390

Not sure? Walk on it. Does your boot leave a shape? Press a stick in. Does it go in 6+ inches? Roll a sample. Does it hold a ball? These tell you which side of the picker you're on.

Preparation is recorded. Stone and rolling do not automatically establish a higher CBR.

Mats are not bridging tools. Rutting must be filled before install.

Optional advanced fields ▾

Use representative site test data. Entered CBR is retained without an uplift for preparation.

Step3

The Space

Enter the area in square metres.

📞 Talk to Us · 01785 290390
Indicative · Confirmed by call

Your Recommendation

Based on your ground, plant, duration and seasonal context. Always best to give us a call to confirm before kit goes out.

Option A · Recommended
TM 50 Medium Duty
115 mats
300 m² coverage · +10% allowance
Photo coming soon

Why this solution

View Solution →
Option B · Alternative
TM 120 Heavy Duty
40 mats
300 m² coverage · +10% allowance
Photo coming soon

Why this solution

View Solution →
Want this in your inbox?Email yourself the result and the matching spec sheets.

What to watch

    Indicative recommendation only. We'll confirm with you by phone or email before any commitment. A site survey may be needed to confirm spec on some projects. Most of the time, photos will do.
    Fastest Next Step

    Send your starting point for review.

    Tap the button and your recommendation goes with you: mat class, quantity, the lot, pre-filled. Add photos of the route straight from site and we'll confirm the spec and send the proposal back over WhatsApp, usually the same working day.

    WhatsApp this spec → Prefer to talk? Call 01785 290390 · Or email yourself the result below
    TrackMatz
    ● online · replies same working day
    Pre-filled from your result. One tap.
    Example ground photo ready to send with a TrackSpec result
    Hi TrackMatz, here is my TrackSpec result. Here are photos of the ground.
    Ready to send
    We confirm the spec against your photos and send the proposal and spec sheets back, usually the same working day.
    PDF
    TrackMatz-Proposal.pdf
    Proposal · spec sheet · T&Cs
    How this works
    1
    Tell us about the project Plant, ground, slope, season, duration and the space to cover.
    2
    Get your next step Indicative product options and an area estimate, or a project review where selection needs more evidence.
    3
    Call or email. We'll confirm TrackSpec™ gives the headline. We confirm the spec before any commitment.

    TRACKSPEC / VIDEO GUIDE

    See how TrackSpec works.

    2 minutes 2 seconds · Captions included
    Read the video transcript

    Hi, I'm Mark from TrackMatz. If you're planning temporary access or ground protection, TrackSpec helps you work out where to start, and here's how to use it.

    First, tell us about the project. Choose the vehicle or plant type, enter the weight of the heaviest machine, and tell us how often the route will be used and how long you require the mats for.

    Next, tell us about the site. Enter your postcode for a regional ground guide, then choose the ground description that best matches what you have actually there. The postcode guide draws on regional soil information with British Geological Survey information as a source. It gives us useful background, but it does not measure the ground on your site.

    You will also see CBR mentioned. That stands for California Bearing Ratio. It's a measure of how strongly tested ground resists penetration. A high result means greater resistance under those test conditions. It is not a vehicle weight limit.

    If you have a measured site CBR, enter it into the advanced options. Otherwise, TrackSpec uses an estimate.

    Add your project start month and any agreed ground preparation, so the tool can take the hire period and seasonal conditions into account.

    Finally, choose your layout and enter the route length or area. Then select Get My Recommendation.

    Where the tool can suggest a suitable starting point, you'll see a recommended mat, an alternative, indicative quantities and points to watch. Some projects will need a conversation before a product can be suggested.

    You can email yourself the result or send it to us on WhatsApp with photographs of the route and ground.

    We will then review the project with you and confirm the specification before anything is agreed. Tell us about soft spots, rutting, slopes, site access or anything you're unsure of.

    Start with TrackSpec, then let us talk through your project.