Temporary roadway hire across the UK. Keep vehicles moving. Qualify the route.

Temporary road surface hire for assessed vehicle routes, haul roads and access spines over soft, seasonal or sensitive ground. TrackMatz matches the roadway class, quantity and straight-run layout to the ground, loading, traffic and programme.

Ground evidenceCBR where available, visible condition, drainage, season and weather exposure.
Vehicle loadingGross weight plus axle, wheel, track and any concentrated loading.
Route geometryStraight runs, direction changes, width, passing, turning and interfaces.
Operating planTraffic frequency, speed, braking, duration, inspection and weather response.
THE ROADWAY DECISION

A temporary road is a system. Not a line of mats.

Temporary roadway hire, temporary road mats hire and portable roadway hire all describe the same commercial need: keep planned movements operating without treating a product load figure as automatic site permission. Read the CBR guide and working load guidance for the evidence behind that decision.

01 · SUBGRADE

Can the ground carry it?

Measured evidence is strongest. Postcode and mapped ground context can support screening, but they are not measured site CBR.

02 · VEHICLE

What is actually crossing?

Review gross weight, axle arrangement, wheel or track footprint, attachments and any concentrated loading.

03 · MOVEMENT

How will the route work?

Repeated traffic, turning, braking, speed, passing, reversing and crossings can govern the solution.

04 · CONTROL

What keeps it serviceable?

Preparation, connections, edges, inspection, weather response, maintenance and removal are part of the plan.

PROJECT INPUTS AND OUTPUTS

Plan the route before mobilisation. Make the assumptions visible.

Send the site plan, ground information, vehicle schedule and programme. TrackMatz scales the review to the project risk and identifies where more evidence or engineering input is needed. The delivery and installation guide covers access, unloading, sequencing and responsibilities.

What we need

  • Site postcode, exact route, width, gradients and direction changes
  • Surface condition plus CBR, survey, test or observation evidence
  • Vehicle, axle, wheel or track details and concentrated loads
  • Traffic frequency, turning, braking, passing and reversing plan
  • Dates, duration, season, weather exposure and programme constraints
  • Delivery access, unloading point, working areas and site restrictions

What the project receives

Class and quantityRecommendation with the evidence, assumptions and exclusions stated.
Roadway layoutStraight runs, overlapped direction changes, interfaces and agreed working zones.
Delivery and installation planAccess, unloading, lifting, sequence, connection method and responsibilities.
Controls and escalationInspection, weather response, maintenance and any further testing or competent engineering review.
ROADWAY PRODUCT CLASSES

Three roadway options. One project-specific decision.

The roadway range starts with assessed lighter vehicle routes and extends to the highest-demand access conditions. Published supplier guidance describes product capability under stated conditions, not permission for a particular site.

TM50 Isokon ISOtrack L temporary roadway mat

TM50

Assessed lighter routes

For suitable vehicle routes and compounds after reviewing ground, loading, traffic frequency, turning and duration. Isokon guidance is up to 20 tonnes on softer ground and more than 50 tonnes on firm ground.

2,410 × 1,200 × 20mm · 2.89m² · 36kgExplore TM50 →
TM120 heavy duty temporary roadway panel

TM120

Higher-demand roadway

For assessed heavy vehicle access, haul routes, compounds and controlled plant movements. Supplier guidance is loads up to 60 tonnes and vehicles up to 100 tonnes, subject to the complete project conditions.

3,000 × 2,500 × 40mm · 7.5m² · 295kgExplore TM120 →
TM200 Isotrack X highest duty temporary roadway panel

TM200 by Isokon

Highest-demand conditions

For major access routes and working areas after detailed review. Isokon guidance exceeds 200 tonnes depending on ground conditions. Concentrated loads require further assessment.

4,000 × 2,000 × 102mm · 6.84m² usable · approx. 360kgExplore TM200 →
Roadway boundary: TM10 is pedestrian-first and is not presented as a roadway class. Cranes, outriggers, concentrated loads, steel tracks, unsupported ground and heavy repeated traffic require the appropriate escalation. Mats must not bridge trenches, voids or unsupported areas.
ILLUSTRATIVE SECTOR LAYOUTS

Keep the project drawings. Use them to explain the route.

These examples show how straight roadway runs, controlled direction changes and working zones can be coordinated in four common settings. They are illustrations only, not temporary works designs, not traffic plans and not automatic product permissions.

straight roadway runoverlapped direction changecontrolled working zone

Civils and construction

gate · haul route · laydown
Illustrative civils roadway layoutStraight roadway runs from a site gate to a laydown zone and work area, with overlapped joints at two direction changes.LAYDOWN ZONEWORK AREACONTROLLED ENTRY

A defined gate route connects laydown and work areas. Direction changes are formed as straight runs with overlapped joints, not curved mat lines.

Solar and renewables

separate gates · one-way flow
Illustrative solar farm roadway layoutA one-way temporary roadway runs between separate entry and exit gates with a straight service spur to a delivery zone.DELIVERY ZONEINOUT

Separate gates can reduce reversing and passing. The project traffic plan, banksman controls and safe interfaces remain site responsibilities.

Utilities and infrastructure

linear route · service spurs
Illustrative utilities roadway layoutA long straight access route serves two controlled work zones through short straight spurs with overlapped joints.LINEAR WORKS CORRIDORWORK ZONE AWORK ZONE B

A linear roadway can serve controlled work zones through straight spurs. Passing, turning, gradients, crossings and emergency access are reviewed separately.

Events and production logistics

production gate · back of house
Illustrative event production roadway layoutA temporary production roadway links the gate, staging area and back-of-house zone while a separate pedestrian line crosses at a controlled point.STAGINGBACK OF HOUSECONTROLLED PEDESTRIAN INTERFACE

Production traffic is kept on a defined back-of-house route. Pedestrian crossings and live-event interfaces require the event and traffic plans to be coordinated.

Illustration boundary: final suitability depends on ground condition, CBR evidence where available, vehicle and contact loading, traffic, turning, duration, weather, preparation, layout and site controls.

ROADWAY IN CONTEXT

Real access projects. Different operating demands.

Photography shows what temporary roadway and trackway hire can look like in context. It does not establish suitability for another site.

Straight temporary roadway laid across grass

Defined vehicle route

Route width, approach, direction changes and edge interfaces are planned around the movement.

Heavy plant operating over composite temporary access panels

Higher-demand access

Ground, loading, traffic and operation determine whether a higher class or further review is needed.

Composite matting supporting linear utilities access

Linear infrastructure

Long routes need interfaces, spurs, inspection and changing ground conditions considered along the alignment.

DELIVERY AND INSTALLATION

From brief to off-hire. One documented route plan.

STEP 01

Brief the route

Define the exact alignment, ground evidence, vehicles, traffic, dates and operating constraints.

STEP 02

Qualify and plan

Confirm class, quantity, straight runs, joints, interfaces, assumptions and escalation.

STEP 03

Deliver and install

Coordinate delivery, unloading, lifting, connections and sequence around the agreed site plan.

STEP 04

Support and remove

Agree inspections or maintenance for longer hires, then coordinate the off-hire sequence.

INDICATIVE STARTING POINT

Start with TrackSpec™. Then confirm the roadway.

TrackSpec uses the project information supplied, including postcode context, to suggest an indicative product class and quantity. The TrackMatz team reviews the result before a commercial recommendation is confirmed.

Use TrackSpecIndicative roadway class and quantity · human project review followsSTART →

Screening contextPostcode and mapped ground information are not measured site CBR.
Indicative resultTrackSpec is not site investigation, temporary works design or engineering approval.
Human confirmationGround, loading, traffic, route, duration and escalation are reviewed with the project.
TEMPORARY ROADWAY FAQ

Common search questions. Clear project answers.

What is temporary roadway hire?

It is the hire of connected composite panels to create an assessed temporary vehicle route over ground where an unprotected movement could be unsuitable. The ground, vehicle, traffic, geometry and controls determine the system.

What is the difference between temporary roadway hire and broader temporary access?

This page focuses on a defined vehicle roadway or haul route. For a broader temporary-access brief, compare track mats for hire. Where protecting grass, paving or sensitive ground is the main requirement, see ground protection mats hire.

Can a temporary roadway carry HGVs or heavy plant?

Potentially, but vehicle weight alone is not approval. Ground evidence, axle and contact loading, traffic, turning, preparation, layout and any concentrated loads must be reviewed.

How much temporary roadway do I need?

Quantity depends on route length and width plus direction changes, passing or turning areas, work zones, interfaces and contingency. TrackSpec can provide an indicative starting point before project review.

Is portable roadway hire suitable for soft ground?

It can spread load and support access where the project assessment supports it, but mats do not make weak ground strong. Very weak, unsupported or changing ground may require testing, preparation, a higher class or competent engineering review.

SEND THE ROADWAY PROJECT

Share the route and operating plan. We will qualify the next step.

Tell us the exact alignment, ground, dates, vehicles, traffic and direction changes. Photos, drawings, CBR evidence and access information help us respond at the right level.

Temporary roadway project review

Used to respond to this project enquiry. If you have photographs, ground evidence or a site plan, send them by email or WhatsApp after submitting. See the Privacy Policy.