Event matting hire. Plan every movement.

Ground protection for the build, the live event and the break. Coordinate production access, pedestrian routes, temporary parking and working areas around one assessed event-ground plan.

One event, several zonesMatch pedestrian, vehicle and production areas to their actual demand.
Build through breakPlan for changing traffic, weather and ground condition across the full programme.
UK delivery and installationLayout, logistics and installation support agreed around the project.
The event programme

Different pressure. Every phase.

The same route can face different vehicles, traffic frequency and ground conditions as an event develops. A useful plan considers the whole programme, not only opening day.

PHASE 01

Build

Deliveries, production vehicles, welfare, structures and equipment create concentrated movements before the public arrives.

  • Supplier and HGV approach
  • Production route and turning
  • Working and laydown areas
PHASE 02

Live event

Visitor routes, parking, servicing and back-of-house movements need clear separation and an accessible, legible layout.

  • Safe pedestrian movement
  • Wheelchair-accessible routes
  • Parking and hospitality access
PHASE 03

Break

Repeated traffic and rain can make the final movements the most demanding. Removal planning starts before installation.

  • Outbound production traffic
  • Collection sequence
  • Changing ground and recovery risk
Four event-zone plans

Match each area to its actual use.

Events rarely need one product everywhere. These four illustrations show the main planning conversations, from safe public movement and marquee flooring to parking and winter production access. For a dedicated overflow or field-parking requirement, see temporary car park matting hire.

1 · Combined event access planTM50 route · TM10 marquee and access

Planning conversation: bring an assessed TM50 route from the gate to the production area, floor the marquee with TM10, then provide a separate TM10 pedestrian and wheelchair-accessible route. Dimensions are project inputs, not standard promises.

2 · TM10 accessible-route detailWidth · edges · transitions · gradients

Safety and access: route width, passing provision, ramped transitions, edges, gradients, drainage, lighting and emergency use must be agreed for the actual event. The illustration is a briefing aid, not an accessibility certification.

3 · TM10 marquee floor planPanel count follows surveyed dimensions

Flooring plan: survey the actual marquee footprint, entrances, internal load points and any finish required above TM10. Confirm drainage, subfloor, trip controls and the interface between internal flooring and external access routes.

4 · Seasonal event access planTM50 parking · TM120 service route

Autumn and winter: separate visitor parking from higher-demand supplier and service access. TM120 use remains subject to project assessment, including seasonal ground, repeated traffic, turning, loading and the break sequence.

Illustrations only, not temporary works designs or automatic product permissions. Final suitability depends on ground condition, CBR evidence where available, vehicles, axle and contact loading, traffic, turning, duration, weather, preparation and layout.

Event formats

Built around the operation.

The right conversation changes with the event. Start with the programme and movement plan, then identify where protection is proportionate.

Festival and concert

Production first

Review HGV approaches, stage and service routes, public circulation, parking and the outbound break sequence.

Show and country event

Wide site, mixed traffic

Separate exhibitor, livestock, visitor, service and parking movements across grounds that may vary significantly.

Venue and hospitality

Presentation matters

Coordinate pedestrian approaches, servicing and localised protection around marquees, estates, stadiums and heritage settings.

Product classes

Match the mat to the zone.

Product guidance helps define the options. It does not provide automatic permission for a particular vehicle, route or ground condition. Read the working load guidance and CBR guide for the evidence behind the decision.

TM10

Pedestrian-first
TM10 rubber walkway mat

For pedestrian and accessible event routes. Occasional cars require ground and traffic assessment. Vans and commercial traffic normally require a higher class.

Explore TM10 →

TM50

Assessed vehicle zones
TM50 ground protection mat

For suitable car, van and lighter wheeled-traffic areas after reviewing ground, loading, traffic frequency, turning and duration.

Explore TM50 →

TM120

Higher-demand routes
TM120 heavy-duty ground protection panel

For heavier event traffic and production access where the complete project assessment supports its use. Supplier figures are not automatic site permission.

Explore TM120 →

TM200

Highest-demand conditions
TM200 composite access panel

For demanding routes and ground conditions after detailed review. Concentrated loads, outriggers and steel-tracked plant require specific controls or engineering review.

Explore TM200 →
Important: cranes, outriggers, concentrated loads, steel tracks and heavy repeated traffic require a higher-level project or engineering review where applicable. Mats must not bridge unsupported ground.
Weather and contingency

Plan the break before the forecast changes.

A dry build does not guarantee a dry break. The sensible response is a proportionate contingency plan, not blanket matting or a promise that weather cannot disrupt the event.

Ground conditionUse observations and project evidence, not postcode context alone.
Repeated trafficFrequency, turning and braking can matter as much as vehicle weight.
Season and rainfallReview likely deterioration across the full event programme.
Recovery routeProtect critical movements and agree escalation points before site pressure rises.
Delivery and installation

Make the layout work on site.

The mat selection is only one part of delivery. Access, unloading, installation order, inspection and removal all affect the event programme. See the delivery and installation guide for the full planning method.

Site review

Project-specific review of ground, movements, access constraints and the proposed event layout.

Layout drawings

Drawings can coordinate agreed routes and zones with the event, traffic and production plans.

Installation

TrackMatz-led installation and removal can be planned around build and break schedules.

Longer hires

Scheduled inspection and maintenance arrangements can be agreed where the programme requires them.

Plan your event ground

Send the programme. We will review the movements.

Tell us where the event is, the dates, the main vehicles and the areas you need to protect. Photos, drawings and traffic information help us qualify the next step.

Event project review

Used to respond to this project enquiry. If you have photographs or a site plan, send them by email or WhatsApp after submitting. See the Privacy Policy.