Soils and land agreements
Plan the route around the land agreement, the agreed working width and the condition the land must be returned in.
Temporary access for substations, cable routes, pipelines, water mains and overhead line works. Heavy-duty TM120 and TM200 MegaDeck HD+, planned around the ground, the plant and the programme, with the drawings and RAMS your tender needs.
Indicative only. TrackMatz confirms suitability before any proposal.
Background photographs: TM200 MegaDeck HD+ supplier application examples supplied by Signature Systems, and TrackMatz TM120 installations.
Utility work rarely sits on one strip of ground. Access has to reach the asset, carry the plant, protect the land and come out cleanly when the works finish.
Laydown areas, welfare and plant standing for substation and grid connection works, with loads and the collection plan set out from the start.
Explore ground protection 02Access along the route and working areas at joint bays, phased as the route advances so the mats move with the works.
Explore temporary roadway 03Access for excavation, pipe stringing and plant along mains renewals and pipeline routes, including crossings agreed with the asset owner.
Explore TM200 04Routes to tower and pole positions across farmland and soft ground, planned around land agreements and seasonal ground.
Explore track mats hire 05Access to mast sites, cabinets and fibre routes, where a short programme still needs a firm surface and a clean exit.
Explore site access matting 06Compounds and access routes to rail-adjacent work sites, working within the principal contractor's site controls.
Explore construction accessCard photographs: MegaDeck HD+ supplier application examples, supplied by Signature Systems.
MegaDeck HD+ for utility plant access.
TM200 MegaDeck HD+ is our flagship for heavy plant on utility work. Each large-format panel, about 4.3 x 2.3 m with 7.85 m² of usable cover, joins to the next with MDX connections to form one continuous surface.
Overlapping flanges and MDX connecting pins hold the mats together as one working surface for heavy plant and repeated traffic. Ground evidence, wheel or track loads, turning and the programme are reviewed before any layout is confirmed.
Utility routes often cross farmland, verges, tree roots and wet ground covered by land agreements and environmental commitments. Matting spreads plant loads over the surface and lifts out at the end of the works. Where a scheme sets soil, tree or watercourse requirements, we plan the layout to meet them.
Read the sensitive ground guideIndicative only. TrackMatz confirms suitability before any proposal.
Plan the route around the land agreement, the agreed working width and the condition the land must be returned in.
Keep plant loads off root protection areas and verges where the scheme sets limits, and show those limits on the layout.
Allow for saturated ground and any watercourse crossing rules the scheme or regulator has set.
Matting spreads load but is not a service protection design. Crossings follow the asset owner's protection requirements.
Consider how autumn and winter rain changes the ground over the life of the hire.
Record the route and ground condition at installation and uplift, so handback is evidenced.
Product figures are supplier guidance, not automatic site permission. Ground, configuration, load footprint, traffic, turning, duration and layout can all change suitability.

Large-format panels joined by MDX connections into one continuous surface, for heavy plant and repeated traffic. Ground strength, loads and layout are assessed for each project.
Review TM200
For access routes, compounds and joint bay working areas where the complete ground, traffic and layout picture supports the class.
Review TM120
For vans, light plant, parking and welfare areas where ground and traffic conditions suit the lighter class.
Review TM50
For pedestrian routes to welfare, offices and inspection points. Occasional vehicles still need a ground and traffic assessment.
Review TM10No universal vehicle approval. TrackMatz confirms the proposed class and layout against the project information before any proposal.

Bring us in at tender stage. From your drawings and programme we prepare the access proposal your estimators and planners need. Tender packs back within 24 hours.
Site plan, programme, plant list and any ground information or photographs.
Layout, quantity schedule and RAMS back within 24 hours.
Delivery access, offload, installation sequence and inspection arrangements for longer hires.
Move the route with the works, then uplift and hand back the ground.
Two examples of access-route layouts and numbered quantities for planning work around utility sites.
Illustrative concepts, not completed projects or construction designs.
30m access run into a 15m × 12m laydown pad.
Unequal access runs with an end section, corner allowances and entrance apron.
Send your site plan and programme for a layout for your project.
Send tender drawingsDimensions govern; do not scale from a screen. Ground support, drainage, loads, turning, connections and edge transitions require project-specific review. The quantities relate only to the panels shown on each drawing.

From TM10 and TM50 to TM120 and TM200 MegaDeck HD+, we supply ground protection and heavy-duty trackway matched to your project. Choose dry hire or a fully installed solution, with availability confirmed against your dates and layout. 24-hour mobilisation is available for stock held at our Stafford yard.
UK mainland coverage; Highlands, islands and Northern Ireland on request.
Ask for the supplier pack with your tender enquiry.
Move from the utility context into the technical question that needs answering, then return with clearer project information. The Gildersome utility-access case study shows a contractor-installed route supplied by TrackMatz.
Understand what CBR can and cannot tell you about the formation.
Open the guide →02Separate supplier figures from footprint, traffic, layout and site permission.
Open the guide →03Review access, offload, route geometry, installation and collection inputs.
Open the guide →04Why clay loses strength through autumn and winter, and how to plan for it.
Open the guide →The right starting point is enough information to identify the next technical decision, not a product selected from vehicle weight alone.
Yes. Our crews work to the principal contractor's induction, permits and site controls, and to the RAMS agreed for our scope.
Matting spreads load, but it is not a service protection design. Crossings over buried services follow the asset owner's protection requirements, and we plan the layout to what they specify.
Yes. Send the drawings, programme and plant list and we return a layout drawing, quantity schedule and RAMS for our scope within 24 hours.
Yes. Larger programmes are planned with the supply lead time agreed at tender, and the route can be phased so the mats move forward with the works.
Either. Dry hire is delivery and collection, with your team laying and lifting. Full service adds our installation, inspection and uplift.
Site location or drawings, the plant and loads, route or area sizes, ground information and photographs, programme dates and any access or offload limits.
Send the drawings, programme, plant list and ground information. Layout, quantity schedule and RAMS back within 24 hours.
Indicative only. TrackMatz confirms suitability before any proposal.