UTILITIES · INFRASTRUCTURE · TEMPORARY ACCESS

Utility and infrastructure access. Planned around the works.

Temporary access for substations, cable routes, pipelines, water mains and overhead line works. Heavy-duty TM120 and TM200 MegaDeck HD+, planned around the ground, the plant and the programme, with the drawings and RAMS your tender needs.

Indicative only. TrackMatz confirms suitability before any proposal.

Background photographs: TM200 MegaDeck HD+ supplier application examples supplied by Signature Systems, and TrackMatz TM120 installations.

GROUNDEvidence and season reviewed
PLANTWheel and track loads, not headline tonnes
PROGRAMMEPhased with the works
PAPERWORKDrawings, RAMS and quantity schedule
HEAVY PLANT ROUTES

TM200

MegaDeck HD+ for utility plant access.

TM200 MegaDeck HD+ is our flagship for heavy plant on utility work. Each large-format panel, about 4.3 x 2.3 m with 7.85 m² of usable cover, joins to the next with MDX connections to form one continuous surface.

Overlapping flanges and MDX connecting pins hold the mats together as one working surface for heavy plant and repeated traffic. Ground evidence, wheel or track loads, turning and the programme are reviewed before any layout is confirmed.

SENSITIVE GROUND

Protect the land. Leave a clean handback.

Utility routes often cross farmland, verges, tree roots and wet ground covered by land agreements and environmental commitments. Matting spreads plant loads over the surface and lifts out at the end of the works. Where a scheme sets soil, tree or watercourse requirements, we plan the layout to meet them.

Read the sensitive ground guide
Run TrackSpec™Indicative class and quantity for your utility routeSTART →

Indicative only. TrackMatz confirms suitability before any proposal.

01

Soils and land agreements

Plan the route around the land agreement, the agreed working width and the condition the land must be returned in.

02

Tree roots and verges

Keep plant loads off root protection areas and verges where the scheme sets limits, and show those limits on the layout.

03

Wet ground and watercourses

Allow for saturated ground and any watercourse crossing rules the scheme or regulator has set.

04

Buried services

Matting spreads load but is not a service protection design. Crossings follow the asset owner's protection requirements.

05

Season and rainfall

Consider how autumn and winter rain changes the ground over the life of the hire.

06

Handback record

Record the route and ground condition at installation and uplift, so handback is evidenced.

TM120 panels and a delivery lorry on an active civils site beneath overhead lines
TENDER SUPPORT

Send the drawings. Get a plan you can price.

Bring us in at tender stage. From your drawings and programme we prepare the access proposal your estimators and planners need. Tender packs back within 24 hours.

Layout drawingMarked on your site plan, showing routes, working areas and interfaces.
Quantity schedulePanels by product class and area, ready for your pricing.
Project-specific RAMSFor our delivery and installation scope, using the site information available.
  1. 01
    Send the drawings

    Site plan, programme, plant list and any ground information or photographs.

  2. 02
    Get the tender pack

    Layout, quantity schedule and RAMS back within 24 hours.

  3. 03
    Plan the movements

    Delivery access, offload, installation sequence and inspection arrangements for longer hires.

  4. 04
    Phase and off-hire

    Move the route with the works, then uplift and hand back the ground.

Read the delivery and installation guide
EXAMPLE LAYOUTS

See the layout.
See the quantities.

Two examples of access-route layouts and numbered quantities for planning work around utility sites.

Illustrative concepts, not completed projects or construction designs.

TM120 Access road into a laydown pad, 36 mats, illustrative example

TM120 · Access road into a laydown pad

30m access run into a 15m × 12m laydown pad.

36 matsIllustrative concept · not for constructionOpen full drawing
TM200 MegaDeck HD+ Return route with entrance apron, 75 mats, illustrative example

TM200 MegaDeck HD+ · Return route with entrance apron

Unequal access runs with an end section, corner allowances and entrance apron.

75 matsIllustrative concept · not for constructionOpen full drawing

Send your site plan and programme for a layout for your project.

Send tender drawings

Dimensions govern; do not scale from a screen. Ground support, drainage, loads, turning, connections and edge transitions require project-specific review. The quantities relate only to the panels shown on each drawing.

FLEET AND PAPERWORK

Owned fleet. Paperwork ready before you ask.

TrackMatz branded delivery truck with its mounted crane
Our own crane-equipped delivery truck.

Scaled to the programme

From TM10 and TM50 to TM120 and TM200 MegaDeck HD+, we supply ground protection and heavy-duty trackway matched to your project. Choose dry hire or a fully installed solution, with availability confirmed against your dates and layout. 24-hour mobilisation is available for stock held at our Stafford yard.

UK mainland coverage; Highlands, islands and Northern Ireland on request.

For your supply chain team

  • Insurance certificates
  • Health and Safety Policy
  • Sample and project-specific RAMS
  • Company and VAT details
  • Specification sheets for every product class

Ask for the supplier pack with your tender enquiry.

UTILITY QUESTIONS

Clear answers. No false certainty.

The right starting point is enough information to identify the next technical decision, not a product selected from vehicle weight alone.

Can you work under our site rules and permits?

Yes. Our crews work to the principal contractor's induction, permits and site controls, and to the RAMS agreed for our scope.

Can mats go over buried services?

Matting spreads load, but it is not a service protection design. Crossings over buried services follow the asset owner's protection requirements, and we plan the layout to what they specify.

Do you supply drawings and RAMS for tenders?

Yes. Send the drawings, programme and plant list and we return a layout drawing, quantity schedule and RAMS for our scope within 24 hours.

Can you cover a long route?

Yes. Larger programmes are planned with the supply lead time agreed at tender, and the route can be phased so the mats move forward with the works.

Dry hire or installed?

Either. Dry hire is delivery and collection, with your team laying and lifting. Full service adds our installation, inspection and uplift.

What should we send first?

Site location or drawings, the plant and loads, route or area sizes, ground information and photographs, programme dates and any access or offload limits.

NEXT STEP

Send the tender pack. We will come back with the access plan.

Send the drawings, programme, plant list and ground information. Layout, quantity schedule and RAMS back within 24 hours.