Five routes. Five different ground and access requirements.
These documented projects show how product class and layout changed with the ground, traffic and operating requirement. Each story keeps its claims tied to the recorded project.
Real routes. Recorded project evidence.
Compare the product, route and recorded outcome across five different applications.
Confirmed case
RAF MUSEUM · TM120Moving heritage. Protecting the route.
TM120 formed a temporary route for multiple heritage-aircraft movements while the recorded ground outcome remained tied to the project.
Read the RAF Museum case →
Installation stage
HORSE TRIALS EVENT · TM10Children's play arena event matting
Two hundred TM10 panels created a temporary pedestrian surface around a children's play arena at an international horse trials event.
Read the horse-trials case →
Confirmed outcome
MABLETHORPE BEACH · TM50Temporary access across loose beach sand.
Two hundred and ten TM50 mats created a defined temporary event route and were recovered after use.
Read the Mablethorpe case →
Uplift recorded
OUTDOOR EVENT · TM50A 200m route, recorded through uplift.
One hundred and sixty-seven mats formed the planned route, then the full system was uplifted, counted and the ground photographed.
Read the event-roadway case →
Installation
SCHOOL REMEDIAL WORKS · TM120School remedial works: TM120 access installation.
TrackMatz supplied and installed a temporary mat route across the school grounds at Harris Academy, Morden, for remedial roofing works.
See the school installation →
