Tipper and highway maintenance lorries on a TM120 haul road into a primary school construction site
Civils · New primary school build

TM120 haul road and laydown for a new primary school build.

A civils contractor building a new primary school in North Yorkshire needed a firm haul road for site traffic and a laydown area on the grass beside the build. TrackMatz supplied TM120 heavy-duty composite mats to give the build a firm route in and a working area that kept daily traffic and materials off the turf.

TM120Heavy-duty composite mats
North YorkshireNew primary school build
Haul roadPlus a laydown area on grass
Connected panelsOne continuous working surface
The requirement

Site traffic in. Materials on the grass.

The build needed a route that tippers, highway maintenance lorries and site vehicles could use every day, running past the welfare cabins, skips and fenced compound into the school site.

Alongside the route, the contractor needed somewhere to set down plant and materials. The available space was a grass playing field, so the laydown area had to sit on the turf without the field being rutted by daily use.

On site

A haul road and a laydown, working together.

Five views from site.

Site photographs from the TrackMatz team. Vehicle registrations and branding have been blurred.

The product

TM120 heavy-duty composite matting.

Machine-placed panels for haul roads, laydown areas and working platforms, available on dry hire or with installation. For cable, pipeline and substation work, see utility and infrastructure access.

TM120Haul road and laydown on one site
Hire record

Site traffic on the route. Materials off the turf.

The photographs show the haul road in daily use and the laydown area set out on the playing field, giving the build a firm route in for site traffic and a solid working area beside it.

Evidence boundary: this case study records the hire as photographed. Hire dates, quantities and final ground condition are not presented as outcomes.
Planning a similar site?

Start with the traffic. Then size the laydown.

Ground conditions, loading, traffic and duration determine the matting and layout. TrackMatz reviews those details, along with delivery access and whether you want dry hire or installation, before confirming the proposal.

A useful brief includes
  • The site address
  • Vehicles using the haul road and how often
  • Laydown size and what will be stored
  • Dates the route is needed
  • Dry hire or installation